single-turn current transformer Core column type

Core column type: The primary coil is a copper column installed in the wall-penetrating magnetic sleeve, and the wall-penetrating The magnetic sleeve is the main connection between the primary coil and the secondary coil and the primary coil to the ground.

How many open current transformers should be installed in the distribution box, do you know?

When we open the power distribution cabinet, we can see that there are many current transformers in it. Some power distribution cabinets have only one, and some even have five or six. In fact, they all induce current signals from the bus, but the measured currents have different effects. So what role do they all play in the power distribution cabinet?

Application of current transformers

The wiring of the current transformer should follow the series principle: that is, the primary winding should be connected in series with the circuit under test, while the secondary winding should be connected in series with all instrument loads.

​What is the principle of voltage transformer configuration?

If the main wiring is single busbar, single busbar segment, double busbar, etc., install three-phase voltage transformer on the busbar; when there is power on its outlet, it needs to be reclosed to check the synchronization or no voltage, and it needs to be parallel in the same period. Single-phase or two-phase voltage transformers should be installed on the line side.

The working principle of the transformer

​The principle of the current transformer is based on the principle of electromagnetic induction. Its primary winding often has all the current of the line flowing through it. When the current transformer is working, its secondary circuit is always closed.

Transformer Model Specifications

The models of low voltage current transformers are LMZ1-0.5, LMZ1-0.66, LMZJ1-0.5, LMK-0.66, BH-0.66, SDH-0.66 and so on. There are also some special enterprise models, such as ALH-0.66, AKH-0.66 and so on.

Enterprises adapt to mobile office

In many work links, such as quotation, after-sales, logistics, etc., during the epidemic, we did not completely press the pause button, but all departments worked together and cooperated to promote the promotion and development of business and various tasks.

Inspection and installation steps for voltage transformers

Because the voltage transformer is prone to loosening of bolts or rupture of porcelain bushings due to vibration during transportation, it needs to be checked before formal installation to ensure that there is no damage before installation and use. Next, let's take a look at what to check and the steps to install.

Introduction of preventive project detection before voltage transformer is put into use

Preventive testing is an important link in the operation and maintenance of power equipment, and it is one of the effective programs to ensure the safe operation of power equipment.